Cookie preferences

YARDtwin uses essential cookies for authentication and session management. We don’t currently set analytics or marketing cookies, but our cookie policy categorises them ahead of any future change. Read our Privacy Policy, GDPR Policy, and Cookie Policy.

YARDtwin
← All articles
Labour PlanningMay 8, 2026· 5 min read

Plan Your Crewing Better: Inside YARDtwin's Smart Slots Labour Management

Once you are booking arrivals with Smart Slots, you know something most yards never do: roughly how much work is coming, and when. The obvious next question is the one that actually controls your cost — how many people do I need, and where? Answering it from a whiteboard is guesswork. Answering it from your booking schedule is planning.

That is what the Smart Slots labour management function does. It reads your forward booking schedule and turns expected demand into an expected crewing requirement — before the shift starts, while you can still do something about it.

Crew to the work, not to a habit

Most yards crew to a habit: the same number of people every shift because that is how it has always been. Labour management replaces the habit with the demand that is actually booked in:

  • Demand by time band — see where the booked volume concentrates across the day so you can shape start times and breaks around it.
  • By dock and load type — inbound and outbound, live load and drop, are not the same job; the plan reflects the mix you are actually expecting.
  • Over- and under-staffing, before the shift — spot the hour you are light and the hour you are heavy while there is still time to move people.
  • What-if the schedule — see how accepting more bookings in a band, or moving them, changes the crew you will need.

Why this is the difference between busy and productive

Adding staff makes the gate faster; it does not make the yard more productive if half of them are idle in the trough. Matching people to booked demand is how you raise utilisation without cutting service — fewer bodies standing around at 2pm, fewer trucks waiting at 10am, less overtime patching the gap between the two.

The booking schedule and the crew plan are two views of the same thing. When they are connected, every slot you accept already "knows" the labour it implies — so you are never blindsided by a peak you booked yourself.

Start where you are

Labour management is a stage you can switch on when you are ready — run Smart Slots for booking first, then layer crew planning on top once you trust the schedule. It scales from a single shift on one dock to a multi-site operation planning crews across yards.

Turn your booking schedule into a crewing plan with YARDtwin Smart Slots labour management — crew to the work, not to a habit. No hardware, 30-day free trial.

Hi there! Start your free trial in 2 minutes — I'll help you set everything up!